Dorena Dam Hydroelectric Project, FERC No. 11945


Dorena Lake Dam (ACOE photo)

Dorena Lake Dam is located on the Row River, a tributary of the Coast Fork Willamette River in western Oregon, approximately six miles east of the town of Cottage Grove, in Lane County, Oregon. The Dorena project was completed by the U.S. Army Corps of Engineers (ACOE) in 1949 at a cost of $14 million and currently provides flood control, irrigation, recreation opportunities, and improved navigation downstream.

This project, as proposed by Symbiotics LLC, will have an installed capacity of 8.3 MW from two turbine/generator units. The utilization of two units will allow the most efficient usage of the current regulated flow releases ranging from 260 to 812 cfs and a gross design head of 85 feet. This proposal requires no project use modifications and only utilizes a portion of the released flows necessary for the originally authorized project purposes to produce electrical energy. Therefore the area and capacity of the impoundment will not be affected by operation of the proposed hydroelectric project.


Estimated Monthly Power Production

As a run-of-river operation, the Dorena Lake Dam Hydroelectric Project will use only available water released from the reservoir by the ACOE. The estimated monthly power generation will range from 0 gWh (July and August) to a high of 2.3 gWh (February). On average, the annual production would be 17.5 gWh.

The preliminary permit was issued by the FERC on July 27, 2001 to Symbiotics LLC. Almost two years later (April 23, 2003), Symbiotics submitted a Stage I Consultation Document to the agencies. Proposed studies were undertaken during the following year and are still continuing. On April 8, 2004, the Draft License Application (Stage II) was mailed and the Final License Application (Stage III) was mailed to the FERC June 30, 2004.

On July 30, 2004, the FERC made notice that the Dorena Application was accepted for filing and requested that agencies submit additional study requests. An acceptance or defiency letter is expected by the end of August 2004.

The following section contains links to available public documents for the project, as well as the proposed project boundary overlaid on a 1:24K USGS quad, and slideshows presented to the public by Symbiotics LLC. All documents are available in PDF format (please visit the Adobe Acrobat website for a free reader). The files tend to be large, and file sizes have been noted next to links as a warning. They may be more easily downloaded if you right-click on the hyperlink and choose "Save Target As..."

Project Documents and Correspondence

Project Slideshows

Other Project Files

If you have comments regarding this project and wish to have them included in the consultation process, please address them to: